Sitemind demonstration. Representative project data, not a client project.
Input: emails, RFIs, meeting minutes, drawings, contracts, project documents. Output: an answer with every source attached, or "Not in record".
Yes. The architect confirmed the revised detail by email on 17 August. Drawing A-402 Rev C was issued on 19 August. RFI 147 on the waterproofing interface remains open, consultant response overdue since 2 September.
Three. Dave to confirm the pump for Thursday's pour, no confirmation on record. Mark to chase the waterproofing consultant on RFI 147, no correspondence since. Sarah's response to the electrical sub on the switchboard variation, drafted, not sent.
$2,500 a calendar day from the Date for Practical Completion, capped at 10% of the contract sum. The date moved to 14 November by EOT 6.
Not in record. No certificate, email or inspection note from the fire engineer mentions level 3 penetrations. The last fire engineer document is the level 2 certificate, 4 August.
"Not in record" is an answer. It is often the most useful one.